Oct 18th 2014, 11:54:29
That is still correct!
If you're lazy to remember the formula, just take labs/3 as your TPT.
Reasoning: If you assume Labs/Land is 90%, then
0.17*Labs*(1+Labs/Land)+3
0.17*Labs*(1.9)+3
0.323*Labs+3
If you're lazy to remember the formula, just take labs/3 as your TPT.
Reasoning: If you assume Labs/Land is 90%, then
0.17*Labs*(1+Labs/Land)+3
0.17*Labs*(1.9)+3
0.323*Labs+3